الحمد لله والصلاة والسلام على رسول الله وعلى آله وصحبه أجمعين Equipment: Centrifugal Water Cooled Chiller SCHEDULE OF PLANNED PREVENTIVE MAINTENANCE ready to use and / or to be printed doc file Task Description صيانة دورية جداول جاهزة شيلر daily - weekly - monthly - quarterly - semi annual - annual routine maintenance Check the operation and abnormal noise / sound. D Take log sheet every 2 hours. D Check power supply for fluctuation. D Check Oil Level. D Check Oil temperature. D Check gas level. D Check flow switch functioning. D Check Control & electrical connection. M Check all safety control. 6M Check vane operation. M Lubricate vane linkage and other Moving parts. 6M Calibrate all gauges. 6M Check Motor Compressor terminals. 6M Clean condenser and evaporator coils and replace gaskets. A Clean and epoxy count marine box. A Change oil and filter after maintenance. A Change refrigerant filter. A Test for leaks. A download http://www.maryfi.com/up/do.php?id=69 http://depositfiles.com/files/83mnnaog1 في أمان الله !